New 5MG Clearwell at the Jasper Water Treatment Plant in Wichita Falls, Texas.

Client and/or Owner/Operator

City of Wichita Falls
Mr. Daniel Nix
Utility Operations Manager

4801 Big Ed Neal Drive
Wichita Falls, Texas 76307
(940) 691-1153

This project included major improvements to the Jasper Water Treatment Plant. As Project Manager and Lead Engineer, CPB provided professional engineering services including the design and construction of a new 5MG clearwell and baffling, retrofitting an existing 5MG clearwell with baffling, design and construction of 2 valve vaults, and concrete coating of existing structures. Other services included utility relocations, cost analyses and budget preparation, and project management. Construction was completed in 2008 and the total construction cost for the project was approximately $3.6 million.

CPB has a long history and a good working relationship with the City of Wichita Falls. CPB has proved its ability to provide complete civil engineering, project management, and surveying services through multiple collaborations with the City at the Jasper WTP, the River Road wastewater plant, the Lake Kemp Water Supply System, as well as other projects.