Client and/or Owner/Operator

Mr. John Burrus
Director of Aviation, Traffic and Transportation

2100 Seymour Highway
Central Services Complex
Wichita Falls, TX 76301
Phone: 940.761.7640

This project included construction of a new airport terminal along with associate drive ways, parking, utilities and stormwater infrastructure. CPB provided professional engineering services including the design and construction of all concrete flat work outside of the new terminal. Other services included surveying, drainage, grading, utility relocations, cost analyses and budget preparation, and project management. Construction was completed in 2014 and the total construction cost for the project was approximately $21 million.

CPB has a long history and a good working relationship with many cities in North Texas. Our longtime experience and knowledge working with cities in the North Texas area in general regarding local standards, environmental conditions, water conservation and expansive soils allowed us to provide engineered designs tailored to the City’s specific needs.